News - October 2013
30.10.2013 - Testbed operational
After the move to Graz the RELYonIT testbed has been installed at the new location and is operational again.

- Installation of the new testbed infrastructure.

- LO Node heating a wireless sensor node.

- Installed testbed infrastructure.


